Bend Park and Recreation District
![Bend Park and Recreation District logo.](https://www.bendparksandrec.org/wp-content/uploads/2023/08/BendParksandRec-vert-white-ADABlue-tab-01.png)
- fitness & swim
-
- parks & trails
-
-
Registration
Registration
Registration
-
- activities
-
-
By Category (A-M)
-
- facilities
- about
-
Playbook & Playlist
Calendar
News
Jobs
Volunteer
- Register
- home
- Current Projects
- Sawyer Park Asset Replacement Project
Sawyer Park Asset Replacement Project
Michelle-Healy
![Sawyer Park Picnic Area and pathway](https://www.bendparksandrec.org/wp-content/uploads/2021/10/Picnic-Area-2.jpg)
![People riding bikes through Sawyer Park](https://www.bendparksandrec.org/wp-content/uploads/2021/09/Bikers-scaled.jpg)
![The bridge going over the river in Sawyer Park](https://www.bendparksandrec.org/wp-content/uploads/2020/01/Mom-Son-learning-signing.jpg)
![Aerial image of the river through Sawyer Park](https://www.bendparksandrec.org/wp-content/uploads/2020/01/Sawyer-footbridge.jpg)
![A full parking lot at Sawyer Park](https://www.bendparksandrec.org/wp-content/uploads/2021/10/Weekday-Lot-Pic-1-e1693498563822.jpg)
Sawyer Park Asset Replacement Project
62999 O. B. Riley Road, Bend, OR, USA
Project Phase
- PLANNING
- DESIGN
- PERMITTING
- CONSTRUCTION
Project Overview
Sawyer is one of Bend’s oldest and most beloved parks. Decades of use and increased visitors to the park each year has created the need for an improved entrance and parking lot. The existing ones can no longer provide the needed functions and space for the park.
The project plans include relocating the parking area closer to O.B. Riley Road, adding accessible parking, habitat restoration, improving trail accessibility, and the addition of a permanent restroom, picnic shelter and river overlook. Visit the documents and plans tab to see the preferred concept design and other project planning information.
This project is funded in part by grants from the Land and Water Conservation Fund and the Local Government Grant Program.
62999 OB Riley Road
$2.95 million
LWCF and LGGP grant funds (more than 70% of the project) and Property Tax
Summer 2026
Contact Information
For more information on the Sawyer Park Asset Replacement Project, please contact
Send email to
![](/wp-content/themes/bendperks/img/loader.gif)
Summer 2021 – Parking study completed
Winter 2021/22 – Request for Proposal for the design team advertised
Spring 2022- Design Team selected
June 2022 – Public outreach begins
August 2022 – Initial design concepts complete
August 24th, 2022, 4:00-6:00 PM – Open House at Sawyer Park
October 2022 – Preferred concept design approved by BPRD Board of Directors
April 2023 – LWCF Grant approval
October 2023 – LGGP Grant approval
Puntos clave de la segunda ronda de participación publica